Are u looking to Pass your Certification Exam? Then you have came to the right place here you will find real exam questions of any exam taken from the testing center and aslo links to sites that sell them. So now passing your certification exam has become much easier than before all you have to do is memorize the questions you will see exactly the same questions in the real exam. In today world time is money so by this not only you save time plus you aslo save yourself the hassale of failing

December 01 2009

Microsoft MB6-511 Dumps

AX 4.0 Production

  • Exam Number/Code : MB6-511
  • Exam Name : AX 4.0 Production
  • Questions and Answers : 60 Q&As

Download Pass4sure MB6-511 Dumps from the link below
Download CertifyMe MB6-511 Dumps from the link below
Download Testking MB6-511 Dumps from the link below


Download Microsoft MB6-511 Dumps



PrepKing.com Microsoft MB6-511 Sample Questions

Exam : Microsoft MB6-511
Title : AX 4.0 Production

1. When using ‘Job scheduling’, what planning principle is available, that is NOT available with Operation
scheduling?
A. Planning with queue times
B. Planning on task groups
C. Planning with resource efficiency percent
D. Planning with transportation times
Answer: B
2. When calculating a sales price for a BOM from a sales order line, where is the profit-setting selected?
A. In the Inventory management parameters
B. On the BOM lines
C. In the BOM report as finished journal
D. In the BOM calculation
Answer: D
3. When substituting an item in a BOM on a started production order, it is necessary for the production
planner to delete the material consumption from one of the BOM lines. Material consumption is reported
and posted on the production order. What should be done to properly record the actual material
consumption?
A. Set the status back to Created and delete the production order.
B. Issue the additional material consumptions.
C. Set the status back to Cost estimated.
D. Create a new production picking list journal and create two lines one to decrease, and the other to enter
consumption on the new item.
Answer: D
4. Which of the following does NOT represent a stage or step in the Production Life Cycle in Microsoft
Dynamics AX?
A. Report as finished
B. Create
C. Start
D. Version control
Answer: D
5. What occurs if a production order is released and it has not been estimated or scheduled?
A. Those steps are skipped.
B. The estimation and scheduling steps are performed automatically.
C. The status is reset to ‘Started.’
D. An error message is displayed and the estimation and scheduling steps must be done manually.
Answer: B
6. Without selecting “accept error,” when can a production order be reported as finished?
A. When reporting on the last operation from a route or job card journal.
B. When reporting on any operation from a route or job card journal.
C. When reporting on the first job on the work center.
D. When releasing the production.
Answer: A
7. Which of the following kinds of information are set up requirements in other modules, before the
Production module can be used? Choose the 2 that apply.
A. Company information
B. Items
C. Journal names
D. Routes
Answer: AB
8. A company has limited capacity on its’ machines, but the capacity of the operators is unlimited (already
set on the work center). The team manager wants to plan on the machinery and see the required staff hours
in the production plan. What setup BEST meets the managers requirements?
A. The route is set up with two operations with different operation numbers, one to control the operator and
one to control the machinery. Schedule with finite capacity.
B. The Route is set up with two operations with the same operation number, one to control the operator and
one to control the machinery. Schedule with finite capacity.
C. The route is set up with the use of priority on operations, and scheduling is done with infinite capacity.
D. The route is set up with the use of priority on operations. The scheduling is done with infinite capacity,
and the task group is created on the operators resource.
Answer: B
9. Which of the following is the most accurate way to describe the work center structure in Microsoft
Dynamics AX?
A. The companys work centers are divided into two levels, with the higher level being routing groups and
the lower level being cost categories.
B. They are defined hierarchically, with an unlimited number of levels.
C. The companys work centers are divided into two levels consisting of work center groups and work
centers.
D. The work center definitions in Microsoft Dynamics AX are composed of three tiers, work center groups,
work centers and sub-contractor work centers.
Answer: C
10. Which of the following are possible job types in the routing group? Choose the 2 that apply.
A. Queue before
B. Phantom
C. Setup
D. Subcontractor
Answer: CD
11. A production order goes through a series of updating jobs, step by step. The stage or states of a
production is called the ‘Production order status.’ Which of the following ‘Production order status’
statements is true?
A. The names assigned to the states are in alphabetical order to make it easier to recall the correct
sequence.
B. An authorized user is allowed to update the production order status from ‘Created’ to ‘Report as finished’,
skipping all of the updating jobs in between.
C. When a ‘Scheduled’ production order’s BOM is modified, the production order is already cost estimated,
so there is no way to update the estimated cost.
D. Prior to a production order being ‘Ended’ the production order status can be reset to a previous status in
the cycle.
Answer: D
12. What are the types of production journals?
A. Picking list, Work center card
B. Picking list, Reported as finished, Operation card
C. Picking list, Reported as finished, Route card, Job card
D. Work center card, Route card, Operation card
Answer: C
13. A company has insufficient machine capacity to meet the increased demand for its products. The
company found a local machine shop that can provide the additional capacity. Prior to updating the
routings, the subcontractor’s machines need to be set up as work centers. What work center type should be
assigned?
A. Machine
B. Tool
C. Vendor
D. Human resource
Answer: C
14. Which of the following actions is NOT possible in the BOM Designer?
A. An item can be dragged from the Items table and dropped in the current BOM-tree.
B. An item can be dragged from the BOM tree and dropped in the route to indicate which operation the item
is used in.
C. BOM lines can be deleted from the BOM.
D. By clicking on the operation in the route, all related items can be seen.
Answer: D
15. What defines the capacity for a work center?
A. Working times calendar
B. Working times calendar, and run time
C. Working times capacity
D. Working times factor
Answer: A
16. Production orders are currently being assigned using a number sequence. However, the company you
are working for wants the production order number to be ten digits in length, with the first four digits
representing the current year. How can this be accomplished?
A. This format cannot be supported as the number sequences are limited to a total of eight characters.
B. Update the format of the production number sequence to ’2007######’, where 2007 is the current year.
The format will need to be manually updated each year.
C. Update the format of the production number sequence to ‘yyyy######’. The ‘yyyy’ portion will
automatically be updated with the current year based on the system clock.
D. Go to the production parameters and remove the production number sequence so the number can be
entered in this format.
Answer: B
17. Which of the following are work center cost categories? Choose the 3 that apply.
A. Setup category
B. Process time category
C. Efficiency time category
D. Quantity category
Answer: ABD
18. Which of the following are rules for creating the operation numbers for a simple network route?
Choose the 3 that apply.
A. The last operation in the route must have zero in its next operation field.
B. The first operation in the route must have the lowest operation number.
C. The operation number must be multiples of ten.
D. The operations are linked together by the next operation field, which contains the operation number of
the following operation.
Answer: ABD
19. Which of the following statements reflect the differences between ‘Operation scheduling’ and ‘Job
scheduling’ in Microsoft Dynamics AX? Choose the 2 that apply.
A. Operation scheduling uses forward scheduling only, while Job scheduling can use any of the 12
available scheduling directions.
B. Operation scheduling is date scheduled and Job scheduling is date and time scheduled.
C. When an operation specifies a work center group, Operation scheduling schedules to the work center
group, Job scheduling schedules to a specific work center.
D. Operation scheduling uses unlimited capacity and Job scheduling uses limited capacity.
Answer: BC
20. When outsourcing an operation to a vendor, after work centers and operations are created, the route
must be updated to include the vendor operation. Next the BOM is updated by setting the line type to
‘Vendor.’ What else must be done?
A. Set the ‘Job schedule only’ flag in the Item table to ensure that the production is always Job scheduled.
B. Attach the vendor operation to the BOM line using the operation number field.
C. Assign the vendor to the property field of the BOM line to be able to schedule it.
D. Make sure that all operations in the route are using the same routing group.
Answer: B
21. When is ‘Operation scheduling’ used?
A. To explode the production route operation into jobs.
B. When it is required that starting and ending times are obtained for each operation.
C. When a rough estimate of the time frame for production is required.
D. When task groups are to be used for optimal capacity utilization.
Answer: C
22. How can a fixed material consumption be handled as an addition to the variable material consumption
on the BOM line?
A. Select the material consumption on the BOM line to constant and add the additional consumption.
B. Set a variable and constant material consumption directly on the BOM line.
C. Create a BOM line with constant consumption.
D. Set the scrap on the operation that consumes the material.
Answer: C
23. Using an ‘Assemble to order’ manufacturing strategy; a company assembles vendor supplied
components into the products it sells. Item coverage plans are used to manage adequate inventory levels
of the vendor supplied components. What BOM line type should be assigned to these vendor supplied
components in the BOM of the deliverable product?
A. Vendor
B. Item
C. Production
D. Phantom
Answer: B
24. When manufacturing prototypes, it is desirable to have all ledger transactions posted to separate ledger
accounts specifically created for prototype accounting. Which of the following is the best practice to
accomplish this?
A. Keep a log of used voucher numbers in the prototypes.
B. Create an item group for prototype items with separate accounts, and set up cost categories for the work
centers.
C. Create production groups with separate accounts for prototype production orders.
D. Create special journals with separate ledger accounts for posting the prototype productions.
Answer: C
25. What can task groups on work centers identify?
A. Work center cost
B. The working calendar
C. Alternative work centers
D. Setup and run time
Answer: C
26. Which kind of scrap can be handled in Microsoft Dynamics AX?
A. Scrap on distribution
B. Scrap on BOM and routes
C. Only scrap on BOM
D. Only scrap on routes
Answer: B
27. A company manufactures televisions for customers on demand, but does not keep cabinets and prints
in inventory. Therefore, the production of cabinets and prints is carried out parallel to the assembly of the
televisions. What is the BEST solution to use in this situation?
A. Activate the route network parameter, and build the route structure using the ‘next operation.’
B. Activate the route network parameter, and build the route structure, using priority on the operations.
C. De-activate the route network parameter, and build the route structure using the ‘next operation.’
D. De-activate the route network parameter, and build the route structure, using priority on the operations.
Answer: A
28. During scheduling, what is the best method to account for the extra use of capacity due to material
scrapped?
A. Set up a scrap percentage in the route.
B. Set up a higher consumption of materials on the production BOM.
C. Set up a scrap type on the production BOM.
D. Start a greater quantity corresponding to the yield
Answer: A
29. What tool can be used to evaluate existing inventory transactions and calculate minimum inventory
levels?
A. Action analysis
B. Safety margin
C. Safety stock journal
D. Open order reduction principle
Answer: C
30. One of your company’s work centers is going to be used for two hours in each eight hour shift for
training. What adjustment needs to be made for this work center so only six hours of production work is
planned for this work center shift?
A. Set the efficiency percentage to 75.
B. Set the operations scheduling percentage to 75.
C. Set the capacity to six.
D. Set the run time to six.
Answer: B
31. Which of the following is affected when specifying scrap for an operation on a route? Choose the 2
that apply.
A. Queue time before
B. Setup time
C. Run time
D. Material consumption
Answer: CD
32. A production is fully started, but the material consumption is only partly posted. When the remaining
material is on-hand, how can ONLY the remaining quantity be registered and posted in a picking list
journal?
A. Create and post a picking list journal with the remaining quantity from the Material stock out list.
B. Create and post a picking list journal with the remaining quantity for the production order.
C. Create a picking list journal with the remaining quantity when reporting the production order as finished.
D. Create a picking list journal with the remaining quantity when costing a production order.
Answer: B
33. What setup determines whether items for a production can be automatically reserved?
A. Items’ inventory dimension groups
B. Items’ inventory model groups
C. Production order setting
D. Inventory management parameters
Answer: C
34. When can a production order be split?
A. The production order can only be split when its status is ‘Created.’
B. It may be split up until the total scheduled quantity is started.
C. A production order can be split once and this must be done prior to Job scheduling.
D. A production order can be split once and this must be done prior to Operation scheduling.
Answer: B
35. Which of the following are types of inventory dimensions in Microsoft Dynamics AX?
A. BOM and work centers
B. Items and storage
C. Journals and picking lists
D. Production orders and purchase orders
Answer: B
36. All items in inventory have a batch number. The batch number is not being printed in the production
picking list journal. What can be done to ensure the batch number is printed on the report?
A. Set it up in the production parameters.
B. Set it up on the production picking list journal.
C. Set it up when printing the production picking list journal.
D. Set it up in the production order default values.
Answer: C
37. When the production ledger setting is Item + Category, what ledger accounts are used for posting work
center consumption?
A. The ledger accounts specified on the work center group used by each operation in the route.
B. The ledger accounts specified on the work center.
C. The ledger accounts specified on cost categories attached to the operations.
D. The ledger accounts specified in the set up of the routing groups.
Answer: C
38. An item in inventory is stored in packages of four pieces in airtight containers. Once the container is
broken, any excess items must be discarded. How can one ensure that a whole number of packages is


Download Microsoft MB6-511 Dumps


November 30 2009

ISEB BH0-006 Dumps

ITIL V3 Foundation Certificate in IT Service Management

  • Exam Number/Code : BH0-006
  • Exam Name : ITIL V3 Foundation Certificate in IT Service Management
  • Questions and Answers : 120 Q&As

Download Pass4sure BH0-006 Dumps from the link below
Download CertifyMe BH0-006 Dumps from the link below
Download Testking BH0-006 Dumps from the link below


Download ISEB BH0-006 Dumps



PrepKing.com ISEB BH0-006 Sample Questions

1. Which of the following BEST describes ‘Partners’ in the phrase “People, Processes, Products and Partners”?
A. Suppliers, manufacturers and vendors
B. Customers
C. Internal departments
D. The Facilities Management function
Answer: A

2. Which process is responsible for recording the current details, status, interfaces and dependencies of all services that are being run or being prepared to run in the live environment?
A. Service Level Management
B. Service Catalogue Management
C. Demand Management
D. Service Transition
Answer: B

3. The consideration of business outcomes and value creation are principles of which part of the Service Lifecycle?
A. Continual Service Improvement
B. Service Strategy
C. Service Design
D. Service Transition
Answer: B

4. Which of the following is NOT a benefit of using public frameworks and standards?
A. Knowledge of public frameworks is more likely to be widely distributed
B. They are always free ensuring they can be implemented quickly
C. They are validated across a wide range of environments making them more robust
D. They make collaboration between organizations easier by giving a common language
Answer: B

5. Which of the following is NOT the responsibility of the Service Catalogue Manager?
A. Ensuring that information in the Service Catalogue is accurate
B. Ensuring that information within the Service Pipeline is accurate
C. Ensuring that information in the Service Catalogue is consistent with information in the Service Portfolio
D. Ensuring that all operational services are recorded in the Service Catalogue
Answer: B

6. Which of the following is NOT an example of a Service Provider Type?
A. Internal service provider
B. External service provider
C. Third-party provider
D. Shared services unit
Answer: C

7. Which of the following is a responsibility of Supplier Management?
A. Development, negotiation and agreement of Service Level Agreements (SLAs)
B. Development, negotiation and agreement of contracts
C. Development, negotiation and agreement of the Service Portfolio
D. Development, negotiation and agreement of organizational Level Agreements (OLAs)
Answer: B

8. Which of the following Availability Management activities are considered to be proactive as opposed to reactive?
1. Risk assessment
2. Testing of resilience mechanisms
3. Monitoring of component availability
A. All of the above
B. 1 and 2 only
C. 1 and 3 only
D. 2 and 3 only
Answer: B


Download ISEB BH0-006 Dumps


November 30 2009

IBM 000-M70 Dumps

IBM Information Management Optim z/OS Technical Mastery v1

  • Exam Number/Code : 000-M70
  • Exam Name : IBM Information Management Optim z/OS Technical Mastery v1
  • Questions and Answers : 110 Q&As

Download Pass4sure 000-M70 Dumps from the link below
Download CertifyMe 000-M70 Dumps from the link below
Download Testking 000-M70 Dumps from the link below


Download IBM 000-M70 Dumps


November 30 2009

IBM 000-M45 Dumps

IBM Information Management DB2 Technical Mastery v2

  • Exam Number/Code : 000-M45
  • Exam Name : IBM Information Management DB2 Technical Mastery v2
  • Questions and Answers : 110 Q&As

Download Pass4sure 000-M45 Dumps from the link below
Download CertifyMe 000-M45 Dumps from the link below
Download Testking 000-M45 Dumps from the link below


Download IBM 000-M45 Dumps


November 30 2009

IBM 000-M40 Dumps

IBM Info Mgmt InfoSphere Warehouse Technical Mastery v2

  • Exam Number/Code : 000-M40
  • Exam Name : IBM Info Mgmt InfoSphere Warehouse Technical Mastery v2
  • Questions and Answers : 110 Q&As

Download Pass4sure 000-M40 Dumps from the link below
Download CertifyMe 000-M40 Dumps from the link below
Download Testking 000-M40 Dumps from the link below


Download IBM 000-M40 Dumps


November 30 2009

IBM 000-M36 Dumps

IBM Maximo Asset Management Technical Sales Mastery Test v1

  • Exam Number/Code : 000-M36
  • Exam Name : IBM Maximo Asset Management Technical Sales Mastery Test v1
  • Questions and Answers : 110 Q&As

Download Pass4sure 000-M36 Dumps from the link below
Download CertifyMe 000-M36 Dumps from the link below
Download Testking 000-M36 Dumps from the link below


Download IBM 000-M36 Dumps


November 30 2009

IBM 000-M34 Dumps

IBM Information Management pureXML Technical Mastery Test v2

  • Exam Number/Code : 000-M34
  • Exam Name : IBM Information Management pureXML Technical Mastery Test v2
  • Questions and Answers : 110 Q&As

Download Pass4sure 000-M34 Dumps from the link below
Download CertifyMe 000-M34 Dumps from the link below
Download Testking 000-M34 Dumps from the link below


Download IBM 000-M34 Dumps


November 30 2009

IBM 000-557 Dumps

U2 Family Application Developer 2009

  • Exam Number/Code : 000-557
  • Exam Name : U2 Family Application Developer 2009
  • Questions and Answers : 222 Q&As

Download Pass4sure 000-557 Dumps from the link below
Download CertifyMe 000-557 Dumps from the link below
Download Testking 000-557 Dumps from the link below


Download IBM 000-557 Dumps


November 30 2009

IBM 000-200 Dumps

IBM Storage Sales V1

  • Exam Number/Code : 000-200
  • Exam Name : IBM Storage Sales V1
  • Questions and Answers : 50 Q&As

Download Pass4sure 000-200 Dumps from the link below
Download CertifyMe 000-200 Dumps from the link below
Download Testking 000-200 Dumps from the link below


Download IBM 000-200 Dumps



PrepKing.com IBM 000-200 Sample Questions

1. Which of the following competitors offers customers a virtual tape solution for mainframes?
A. Sony
B. NetApp
C. Quantum
D. Sun Storage Tek
Answer: D

2. A retail customer has a combination of Microsoft Windows file servers with direct attached storage and Power Systems with AIX database servers SAN attached to a DS4700. The DS4700 is reaching capacity, and the customer needs to migrate to a more scalable storage system.
Which of the following would be most appropriate to ask first?
A. Will all servers be SAN attached?
B. What is the budget allocated for storage?
C. What is the projected storage requirement?
D. How much space is available in the current storage systems?
Answer: B

3. The storage specialist is preparing the IBM System Storage DS6800 proposal for replacing a customer’s EMC Symmetrix who’s warranty has expired.
Which of the following TCO advantages should be highlighted in the proposal?
A. Larger disk capacity
B. Flexible warranty and lower power consumption
C. Standard three year warranty and no software maintenance
D. FlashCopy included versus extra cost for TimeFinder
Answer: B

4. A small bio-technical company is interested in implementing an IBM Storage solution.
Which of the following tools can be used to help justify the cost of an IBM System Storage solution to a customer?
A. Disk Magic
B. Total Cost of Ownership Now (TCO)
C. Capacity Magic
D. System Storage Productivity Center (SSPC) for disk
Answer: B

5. Which of the following customer environments is addressed by the NSeries?
A. A customer wanting to implement a global file system
B. A customer with Windows CIFS and AIX NFS requirements
C. A customer who requires good scalability and performance
D. A customer who needs to consolidate multiple storage controllers under one management interface
Answer: B

6. A retail customer is experiencing bottlenecks in their IT environment.
Which of the following responses address this issue?
A. Meet with the IT Director
B. Present IBM’s On Demand storage strategy to CFO
C. Trial install of Tivoli Provisioning Manager (TPM)
D. Perform Disk Magic study
Answer: A

7. A customer has Microsoft Windows, Sun, and Power servers with internal disk. They are porting several applications from other platforms to these servers and need 5 TB of shared disk.
Which of the following is the most cost effective, highly available, shared storage solution for this customer?
A. N5200
B. DS8300 Storage Server
C. DS3400 Storage Server
D. DS5300 Storage Server
Answer: D

8. The Information Technology Director at a prospect is interested in purchasing the N3300, and has asked the storage specialist to help present the solution to the Finance Director.
Which of the following should the storage specialist include in the proposal?
A. CIFS and NFS support is included in the price
B. A configuration showing the technical detail of the solution
C. N3300 combines iSCSI, NAS and FiberChannel into a single storage solution
D. Lowers Total Cost of Ownership (TCO) and improves Return On Investment (ROI)
Answer: D


Download IBM 000-200 Dumps


November 30 2009

IBM 000-086 Dumps

System x High Performance Servers Technical Support V4

  • Exam Number/Code : 000-086
  • Exam Name : System x High Performance Servers Technical Support V4
  • Questions and Answers : 121 Q&As

Download Pass4sure 000-086 Dumps from the link below
Download CertifyMe 000-086 Dumps from the link below
Download Testking 000-086 Dumps from the link below


Download IBM 000-086 Dumps